TEAM INTRODUCTION
——
RECORDS OF OUR TEAM

Before the assembly of sheet metal parts

The assembly workshop will review the assembly process requirements and container information in detail, so as to advance the components that can be assembled in advance to the precise assembly. In addition, it depends on the assembly process and transportation process of the container. For the parts beyond the maximum size of the container, shock absorption measures shall be added at some places with vibration to avoid the damage of sheet metal parts due to vibration.


Into the warehouse

According to the regulations, put some finished products to be assembled or qualified products into the warehouse, and then count them by specially assigned personnel to avoid the omission of outgoing products during installation at the port, and then wait for the final assembly after arrival.


Kingee seiko
Excellent equipment enables the design to be customized quickly
Sheet metal machine
Sheet Metal Assembly
Sheet metal Installation
12 year
Projects Design Experience
68 individual
Machine Design Award
1200 project
Machine Project
56 name
Engineer
QUOTE
  • Name*

    *
  • Email

  • Phone

  • Message

    *
who are we?
Foshan Kingee Seiko Technology Co.,Ltd.

Where we are?

ADD.:A5-2,No.6,CunxiHuanNan Road,Luocun,Shisan Town,Nanhai District,Foshan,Guangdong,P.R.China

How to contact?

Tel:+86-757-82771501
Misa Mobil /WhatsApp:+86-18923221984
Sara Mobil /WhatsApp:+86-18575780246
Email:a1319@kingeeseiko.com
sales@kingeeseiko.com
Social Networking Services